수량산출
Precise quantity take-off
- This process is for predetermined price of client, contractor or contractor's bid price and etc.
- CONCOST provides accurate qunatity take-off with BOQ using Schematic Design, Working Drawing, Specification and etc.
- We discuss and forcast the issues during construction or discrepancy of drawings in advance.
- We ensure accurate BOQ by providing CAD drawings for estimates.
- Working days depend on construction size and type and take 5-10 days.
Resources Available
- 01.Quantity Verification Report
-
02.Supporting resources on Finshing materials
- Building estimate summary sheet : General estimate summary sheet / Estimate summary sheet on each floor / Estimate summary sheet on basis for calculation / basis for calculation
- Quantity analysis table : Analysis of floor / Analysis of ceiling / Analysis of exterior wall
- CAD calculated drawings : Quantity for window and door / length depending on kinds of brick masonry / figures on rooms / outer lines -
03.Supporting resources on Structural member
- Building estimate summary sheet: General estimate summary sheet / Estimate summary sheet on each floor and member / basis for calculation
- Quantity analysis table : Analysis of quantity per pyong / Checklist on each floor / Placing information list
- CAD calculated drawings : Number of column / Length of retaining wall/ Length of Girder and Beam / Slab area