수량산출

Quantity verification on construction site

  • Existing quantities on site can be estimated and reviewed by CAD Calculation Program.
  • Problems can be identified easily by accurate and precise report on quantity take-off and comparison.
  • We provide practical resources which can be used on site.
  • Working days depend on construction size and type and take 5-10 days.

Resources Available

  • 01.Quantity Verification Report
  • 02.Supporting resources on Finshing materials

    - Building estimate summary sheet : General estimate summary sheet / Estimate summary sheet on each floor / Estimate summary sheet on basis for calculation / basis for calculation
    - Quantity analysis table : Analysis of floor / Analysis of ceiling / Analysis of exterior wall
    - CAD calculated drawings : Quantity for window and door / length depending on kinds of brick masonry / figures on rooms / outer lines

  • 03.Supporting resources on structural member

    - Building estimate summary sheet: General estimate summary sheet / Estimate summary sheet on each floor and member / basis for calculation
    - Quantity analysis table : Analysis of quantity per pyong / Checklist on each floor / Placing information list
    - CAD calculated drawings : Number of column / Length of retaining wall/ Length of Girder and Beam / Slab area